Latest News

Things heat up for Pilkington Glass 29/11/2011

One of the world’s leading glass manufacturers, Pilkington, has employed Cosaf to install an innovative radiant heating system at their St Helen’s based storage warehouse.

Cosaf were chosen after a stringent tendering process to design and install the system following a harsh winter that had left Pilkington with undesired factory condensation. Wishing to avoid any possible stock loss, the client was keen to rectify the issue before the winter months set in once again.

HVAC specialists, Cosaf, designed and installed a high level radiant tube heating system to meet the design requirements of site comfort for personnel and to ensure that condensation does not occur across any product range. The heating installation is also monitored from a Trend building management system which links through the sites BMS system.

Mike Sullivan, Director at Cosaf, said:

“This project had to be completed within a strict timescale due to the fast approaching winter months; therefore the team had to implement high level expertise to ensure a timely result that also left the client with a system that met their specific requirements.”

Back To News Listing
Safe Contractor Approved CIBSE Air Conditioning Inspector Envirolink NICEIC Approved Contactor ISO9001 Registered Firm Gas Safe Registered Firm