| Client: |
McVitie's UK, Manchester |
| Requirement: |
Maintaining cooling tunnel temperature |
| Solution: |
Process cooling |
|
 |
A new biscuit production line for McVitie's led to the requirement for a chilled water system to maintain product temperatures within the process production.
Chosen to produce a detailed design for the chilled water system, for seamless integration into an already congested area, CoSaf's considerable experience and 3-Dimensional CAD facilities were employed to provide a key system to maintain quality and speed of production.
Operating automatically, to maintain desired water temperature, an externally located water chiller - supported by internal distribution and food-grade stainless steel pipework - was integral to the CoSaf solution.
|